Cath lab mechanical installation
Assembly in a prepared, construction-ready room, following the manufacturer's installation documentation.
- Ceiling rail and suspension assembly, including FlexArm ceiling hardware
- C-arm stand, patient table and monitor suspension placement and mounting
- Low-voltage interconnect cable routing and connector mating within the mechanical scope
- Control-room console and equipment-room cabinet placement
- Hand-off to licensed or OEM-authorized personnel for terminations and power-on

